Clark County Set to Review Silverado Resort Plans on Las Vegas Boulevard Site
Henrik Becker · Aug 27, 2026

Clark County Set to Review Silverado Resort Plans on Las Vegas Boulevard Site

Michael William Ochoa of Ochoa Development Corporation has filed detailed plans with Clark County for a two-phase hotel-casino resort called Silverado on a vacant 13.5-acre parcel at the corner of Las Vegas Boulevard and Richmar Avenue, and the proposal now moves forward toward a key zoning decision scheduled for September 2, 2026. The site sits roughly five miles south of the Las Vegas Strip, and the filing outlines a 450-room total capacity across both phases with phase one delivering the majority of the rooms and gaming space.
Project Specifications and Phased Development
Phase one calls for a 300-room hotel tower paired with a 57,000-square-foot casino floor, multiple restaurants, dedicated entertainment venues, and structured parking, while phase two would add the remaining 150 rooms plus supporting amenities to reach the full 450-room count. The filings describe the casino as the central feature of the first phase, and county records show the developer submitted permit applications, design reviews, and waiver requests that cover site grading, traffic circulation, and utility connections. Observers note the project would occupy land that has remained undeveloped for years, and the plans position the resort as a standalone destination rather than an extension of existing Strip properties.
Developer Background and Experience
Michael William Ochoa leads Ochoa Development Corporation and brings a track record in local real estate projects, yet the Silverado filing marks his first entry into casino development according to the submitted materials. County planning documents list Ochoa as the primary applicant, and the corporation has provided architectural and engineering studies that accompany the zoning request. Those who've reviewed similar filings in Clark County point out that new entrants often partner with established operators later in the process, though no such partnership appears in the current documents.
Location Details and Regional Context
The 13.5-acre parcel lies along Las Vegas Boulevard south of the main resort corridor, and its proximity to residential and commercial zones in the southern valley has drawn attention from nearby property owners. The location offers direct access from the boulevard while sitting several miles from the densest concentration of gaming facilities, and planners have flagged the need for updated traffic studies as part of the approval package. August 2026 sees continued discussion among county staff about infrastructure upgrades along that stretch of Las Vegas Boulevard, and the Silverado application arrives amid those ongoing reviews. 
Zoning Commission Timeline and Requirements
The Clark County Zoning Commission will consider the application during its September 2, 2026 meeting, and the agenda packet includes requests for height variances, signage approvals, and parking reductions tied to the proposed tower design. County staff have scheduled public comment periods before the vote, and the developer must demonstrate compliance with current master plan guidelines for the area. Project filings and architectural plans for the proposed Silverado casino-hotel can be examined through county planning and zoning documents referenced in the filings. Those documents outline the two-phase timeline, with phase one targeted for construction start shortly after approvals if granted.
Potential Opposition and Neighboring Interests
Michael Gaughan, owner of the nearby South Point casino, has not yet filed formal comments, though past projects in the same corridor have prompted input from established operators concerned about market saturation. County records show no formal opposition letters attached to the Silverado filing at this stage, and the zoning commission will weigh any such input during the September hearing. Observers familiar with Clark County processes note that single-applicant casino proposals sometimes attract scrutiny from existing license holders, and the commission maintains discretion to request additional studies before final action.
Conclusion
The Silverado proposal now rests with Clark County officials who will determine whether the project advances past the zoning stage on September 2, 2026. The filings provide a clear blueprint for the 300-room first phase and the overall 450-room buildout, and the outcome will shape future development patterns along that southern section of Las Vegas Boulevard. County staff continue to process supporting materials in preparation for the scheduled meeting.